These articles cover current industry related topics and installation guides to get the most from your products.
4th October 2021
Swimming pool construction is governed by the BS 8007: Code of Practice for Design of Concrete Struc...
Read more4th October 2021
A – Sand/cement screed or concrete floor B – Damp proof membrane C – Prime using UltraTile...
Read more4th October 2021
Instructions A plastered wall must be at least four weeks old prior to tiling to ensure adequate strength build up and suitable dryness Prior to tiling ensure the plaster is dust free and is not showi...
Read more4th October 2021
For wall tiling applications it is essential that the wall itself has sufficient inherent strength t...
Read more4th October 2021
For wall tiling applications it is essential that the wall itself has sufficient inherent strength t...
Read more4th October 2021
A – Concrete substrate B – Plasterboard C, D, E, F – Apply tanking system according to appl...
Read more4th October 2021
Primers play an important role in preparing surfaces, prior to the application of cementitious tile ...
Read moreHead Office
Danny Morson Way
Birch Coppice Business Park
Dordon, Tamworth B78 1SE
UK Tel: +44 (0) 1827 254 400